← JE Departmental

Past Questions — 2025

JE Departmental • 2025 • Engineering Paper

If r is the radius of the sphere, then the surface area of the sphere is given by;

A) 4  r2
B) 2  r2
C)  r2
D) 4/3  r2
The surface area of a sphere is the total area of the exterior surface of the sphere. In geometry, the formula for the surface area (A) of a sphere with radius 'r' is derived as A = 4πr². Analysis of options: - Option (a) 4πr²: This is the correct mathematical formula for the surface area of a sphere. - Option (b) 2πr²: This represents the surface area of a hemisphere (excluding the base). - Option (c) πr²: This is the formula for the area of a circle with radius r. - Option (d) 4/3 πr²: This is a corrupted version of the volume formula (which is 4/3 πr³). Area must be measured in square units (r²), but the coefficient 4/3 is used for volume, not surface area.
JE Departmental • 2025 • Engineering Paper

An irrigation project is classified as a major project when the CCA involved in the project is more than ___________

A) 2500 hectares
B) 10000 hectares
C) 2000 hectares
D) 5000 hectares
In irrigation engineering and administrative classification (specifically followed by the Central Water Commission and various state irrigation departments in India), irrigation projects are categorized based on their Culturable Command Area (CCA). 1. Major Irrigation Projects: These are projects where the CCA is 10,000 hectares or more. These typically involve large dams, reservoirs, and extensive canal networks. 2. Medium Irrigation Projects: These are projects where the CCA ranges between 2,000 hectares and 10,000 hectares. 3. Minor Irrigation Projects: These are projects where the CCA is less than 2,000 hectares. These usually involve tube wells, ponds, or small weirs. Therefore, since the question asks for the threshold for a 'major project', the correct value is 10,000 hectares.
JE Departmental • 2025 • Engineering Paper

What is the most accurate method of estimation from the following?

A) Building cost index estimate
B) Detailed estimate
C) Plinth area estimate
D) Cube rate estimate
In civil engineering estimation and costing, estimates are categorized based on their level of accuracy and the stage of the project. 1. **Detailed Estimate (Option b):** This is the most accurate method because it involves the preparation of a complete set of drawings and a detailed 'Bill of Quantities' (BOQ). Every single item of work (excavation, concrete, masonry, finishing, etc.) is measured accurately from the drawings and multiplied by the current schedule of rates. It provides the most precise cost projection. 2. **Plinth Area Estimate (Option c):** This is an approximate or preliminary estimate. It is calculated by multiplying the plinth area of the building by a prevailing plinth area rate. It is used for initial budgeting but lacks precision as it ignores specific structural requirements. 3. **Cube Rate Estimate (Option d):** This is also an approximate estimate, more accurate than the plinth area method because it considers the volume (height) of the building, but it is still far less accurate than a detailed estimate. 4. **Building Cost Index Estimate (Option a):** This is a method used to adjust previous costs to current values based on inflation or market indices. It is a tool for updating estimates rather than a primary method of detailed quantification. Therefore, the Detailed Estimate is the most accurate as it is based on actual quantities of materials and labor required for the specific project.
JE Departmental • 2025 • Engineering Paper

Which irrigation method is best suited for orchards and vineyards?

A) Flood irrigation
B) Sprinkler irrigation
C) Drip irrigation
D) Check flooding
Step-by-step reasoning: 1. Analysis of Crop Type: Orchards (fruit trees) and vineyards (grapes) are characterized by wide spacing between plants. They have localized root zones rather than a continuous carpet of vegetation. 2. Evaluation of Drip Irrigation: Drip irrigation (also known as trickle irrigation) delivers water slowly and precisely to the root zone of each individual plant. This minimizes water waste, reduces weed growth between rows, and prevents the foliage from getting wet, which reduces the risk of fungal diseases common in vineyards. 3. Evaluation of Flood/Check Flooding: Flood and check flooding (Options a and d) apply water to the entire surface area. For orchards, this is highly inefficient as it wastes water on the empty spaces between trees and can lead to waterlogging or root rot. 4. Evaluation of Sprinkler Irrigation: While better than flooding, sprinkler irrigation (Option b) applies water to the entire area and the foliage. In vineyards and orchards, wetting the leaves can promote mildew and other diseases, and it is less water-efficient than drip irrigation for widely spaced crops. Conclusion: Drip irrigation is the most efficient and technically suited method for high-value, widely spaced perennial crops like those found in orchards and vineyards.
JE Departmental • 2025 • Engineering Paper

Which is not a form of precipitation?

A) Water vapour
B) Hail
C) Drizzle
D) Snow
Precipitation is defined as any product of the condensation of atmospheric water vapour that falls under gravity from clouds. 1. **Water vapour (Option a):** This is water in its gaseous state. It exists in the atmosphere but is not 'falling' as a product of condensation; rather, it is the source material that must condense or freeze to become precipitation. Therefore, it is not a form of precipitation. 2. **Hail (Option b):** This is a form of solid precipitation consisting of balls or lumps of ice. 3. **Drizzle (Option c):** This is a form of liquid precipitation consisting of very small water droplets (smaller than 0.5 mm). 4. **Snow (Option d):** This is a form of solid precipitation consisting of ice crystals. Since hail, drizzle, and snow are all forms of water falling from the atmosphere to the earth's surface, water vapour is the correct answer as it is the only option that is not a form of precipitation.
JE Departmental • 2025 • Engineering Paper

With what type of mounting does a sprinkler irrigation network give the best results?

A) Nozzles
B) Open Pipes
C) Pipes with holes near the crop
D) Revolving Sprinkler Heads
Sprinkler irrigation is designed to simulate natural rainfall. To achieve the 'best results'—which in irrigation engineering means achieving a uniform distribution of water over a wide area with minimal labor—the system requires a mechanism that can distribute water in a circular or semi-circular pattern. 1. **Revolving Sprinkler Heads (Correct):** These use the pressure of the water to rotate the nozzle, ensuring that water is spread evenly across the field. This prevents over-watering in one spot (which causes runoff/leaching) and under-watering in others, maximizing water-use efficiency. 2. **Nozzles (Incorrect):** While a sprinkler head contains a nozzle, a stationary nozzle alone would only water a small, concentrated area, leading to poor uniformity. 3. **Open Pipes (Incorrect):** This would result in uncontrolled flooding or surface irrigation, not sprinkler irrigation. 4. **Pipes with holes near the crop (Incorrect):** This describes a primitive form of drip or subsurface irrigation, not a sprinkler system, and is highly inefficient due to clogging and uneven pressure distribution.
JE Departmental • 2025 • Engineering Paper

Concrete placed in cold weather will take __________ time to gain strength.

A) No
B) Less
C) More
D) Equal to hot weather
The hardening of concrete is a chemical process called hydration, where cement reacts with water to form calcium silicate hydrate (C-S-H) gel, which provides strength. This chemical reaction is temperature-dependent. According to the Arrhenius equation, the rate of chemical reactions decreases as temperature decreases. In cold weather, the rate of hydration slows down significantly, meaning the concrete takes a longer period to reach its design strength compared to concrete cured at standard or warm temperatures. If the temperature drops below freezing, the hydration process can stop entirely or the water in the concrete can freeze, causing internal damage (spalling). Therefore, concrete placed in cold weather requires 'more' time to gain strength.
JE Departmental • 2025 • Engineering Paper

Alumina in excess causes _________.

A) Reduces the strength of the cement
B) Increases the strength of the cement
C) No change
D) Sometimes increase or decrease the strength of the cement
In the chemical composition of Portland cement, Alumina (Al2O3) acts as a flux, lowering the clinkering temperature. However, its quantity must be carefully controlled. While a moderate amount is necessary for the formation of aluminate phases, an excess of alumina leads to the formation of more C3A (Tricalcium Aluminate). While C3A contributes to early strength, an overall excess of alumina generally reduces the ultimate strength of the cement and increases the heat of hydration, which can lead to cracking. Furthermore, high alumina content makes the cement more susceptible to sulfate attack. Therefore, in the context of overall structural integrity and long-term strength, excess alumina is detrimental.
JE Departmental • 2025 • Engineering Paper

At which point in the entire canal system the duty of water will be more?

A) Head of the Minor
B) Head of the Distributary
C) Head of the Water-course
D) Head of the Branch
Duty of water is defined as the area of land that can be irrigated by a constant supply of 1 cumec of water throughout the base period. In a canal system, water is lost due to seepage and evaporation as it travels from the main canal to the field. 1. Hierarchy of the system: Main Canal $\rightarrow$ Branch Canal $\rightarrow$ Distributary $\rightarrow$ Minor $\rightarrow$ Water-course (Field Channel). 2. Conveyance Losses: As water moves from the head of the branch toward the field, a significant portion is lost to seepage. To deliver 1 unit of water to the field, more than 1 unit must be released at the head of the branch. 3. Relationship with Duty: Duty is inversely proportional to the amount of water required per unit area. Since the most water is 'lost' before reaching the water-course, the water that actually reaches the 'Head of the Water-course' is the most 'efficient' in terms of the area it serves relative to the volume delivered at that specific point. 4. In simpler terms: The duty is lowest at the head of the main canal/branch (because it must account for all downstream losses) and increases as we move downstream. Therefore, the duty is maximum at the point closest to the field, which is the Head of the Water-course.
JE Departmental • 2025 • Engineering Paper

To make out an estimate for a work, the following data are necessary-Drawing, Specification and ___________

A) Materials
B) Rates
C) Labours
D) Transportation
To prepare a detailed estimate for any civil engineering work, three fundamental components are required: 1. **Drawings**: These provide the dimensions, layout, and geometry of the structure, allowing the engineer to calculate the 'Quantities' of work (Measurement). 2. **Specifications**: These describe the quality of materials, the method of execution, and the standards to be followed. This ensures the estimate reflects the correct grade of work. 3. **Rates**: Once the quantities are calculated from the drawings and the quality is defined by the specifications, the 'Rate' (cost per unit of work) is applied to calculate the total cost. Rates are typically derived from the Schedule of Rates (SOR) provided by the government (e.g., PWD SOR). Why other options are incorrect: - **Materials (a)** and **Labours (c)**: These are components *within* the rate analysis. While they are used to derive the rate, the estimate itself requires the final 'Rate' to multiply against the quantity. - **Transportation (d)**: This is a specific cost item that is already included as a component of the unit rate (lead and lift charges).
Page 19
← Prev Next →