Junior Engineer • Paper-I
The hydraulic radius of lined canal water course rectangular in section with a bottom width of 50 cm and depth of low of 25 cm is
A)
0.125 m
B)
0.126 m
C)
0.128 m
D)
0.127 m
Based on established principles in Mechanical Engineering, the correct and most appropriate choice is '0.126 m' (Option B).
Junior Engineer • Paper-I
Which type of canal is not under canal classification on the basis of the function of the canal
A)
Irrigation canal
B)
Watershed canal
C)
Power canal
D)
Navigation canal
Canals are classified based on different criteria. When classified on the basis of their 'function' (the purpose for which they are constructed), the primary types are: 1. Irrigation canals (to supply water to crops), 2. Power canals (to lead water to a turbine for hydroelectric power), and 3. Navigation canals (to allow the movement of boats and ships).
In contrast, a 'Watershed canal' (or more commonly referred to as a Ridge canal or Watershed ridge) is a classification based on the 'alignment' or 'location' of the canal relative to the topography of the land, not its function. A watershed canal is aligned along the ridge line of the area it serves so that it can command land on both sides of the canal by gravity. Therefore, it does not belong to the functional classification category.
Junior Engineer • Paper-I
Peak of a flood hydrograph due to 4-hr effective storm is 400m3/s. The mean depth of the rainfall is 5.9 cm. Assuming an average infiltration loss of 0.35cm/hr and a constant base flow of 25m3/s, estimate the peak of a 4-hr unit hydrograph.
A)
80.23m3/s
B)
83.33m3/s
C)
93.23m3/s
D)
90.33m3/s
Based on established principles in Civil Engineering, the correct and most appropriate choice is '80.23m3/s' (Option A).
Junior Engineer • Paper-I
Discharge through a 90°V- notch weir may be computed by using the equation
A)
Q=0.0138 H5/2
B)
Q=0.0138 H3/2
C)
Q=0.0138 H2/5
D)
Q=1.0138 H2/3
Based on established principles in Mechanical Engineering, the correct and most appropriate choice is 'Q=0.0138 H2/5' (Option C).
Junior Engineer • Paper-I
The Cipoletti weir, a contracted trapezoidal weir the side of the notch has a slope of
A)
1:4
B)
1:2
C)
1:3
D)
1:1
The Cipoletti weir is a contracted trapezoidal weir whose side slopes are made 1 horizontal to 4 vertical (i.e., 1:4). However, in standard exam notation for Cipoletti weir, the side slope is commonly stated as 1 in 4, which corresponds to option a. Since the question asks for the slope of the side of the notch and the given options are 1:2, 1:1, 1:4, and 1:3, the correct choice is 1:4.
Why the others are incorrect:
- 1:2 and 1:3 are too steep and do not match the standard Cipoletti geometry.
- 1:1 is much steeper than the Cipoletti side slope and would not provide the compensating effect for end contractions.
Note: If the options are interpreted in the usual civil engineering convention, the correct option is a (1:4).
Junior Engineer • Paper-I
In Kennedy’s Theory the critical velocity (V), m/s may be written as
A)
V = 0.55m D0.64
B)
V = 0.84D0.65
C)
V = 0.84m D0.64
D)
V= 0.55m D0.65
Kennedy’s theory gives the critical velocity of flow in an alluvial channel as V = 0.55 m D^0.64, where m is Kennedy’s critical velocity ratio and D is the depth of flow in metres. Therefore option (a) is correct.
Why the others are wrong:
- (b) V = 0.84 D^0.65: incorrect because it omits the critical velocity ratio m and uses the wrong coefficient/exponent.
- (c) V = 0.84 m D^0.64: incorrect because the coefficient should be 0.55, not 0.84.
- (d) V = 0.55 m D^0.65: incorrect because the exponent on D should be 0.64, not 0.65.
Junior Engineer • Paper-I
A crop requires a total depth of 9.2cm of water for a base period of 120 days. Then the duty of water is
A)
1130ha/m3
B)
1140ha/m3
C)
1150ha/m3
D)
1120ha/m3
To find the duty of water, we use the standard relationship between Duty (D), Delta (Δ), and Base Period (B).
1. **Given Data:**
- Total depth of water (Delta, Δ) = 9.2 cm = 0.092 m
- Base period (B) = 120 days
2. **Formula:**
The relationship is given by:
Duty (D) = (8.64 × B) / Δ
Where:
- D is the duty in hectares per cumec (ha/m³/s)
- B is the base period in days
- Δ is the total depth of water in meters
3. **Calculation:**
D = (8.64 × 120) / 0.092
D = 1036.8 / 0.092
D ≈ 11269.56 ha/m³/s
Wait, let's re-evaluate the options provided. The options are listed as 'ha/m3', which is a common shorthand in some exams for 'ha/cumec' (hectares per cubic meter per second).
Let's check the calculation again:
1036.8 / 0.092 = 11269.56. This does not match the options (1120, 1130, 1140, 1150).
Let's check if the formula used was D = (8.64 * B) / Δ or if there is a slight variation in constants used in specific textbooks.
If we calculate Δ = (8.64 * B) / D for Option (a) 1130:
Δ = (8.64 * 120) / 1130 = 1036.8 / 1130 = 0.917 m (Not 0.092 m).
Re-evaluating the input: If Δ = 9.2 cm = 0.092 m, the duty should be around 11,270. However, if the Delta was intended to be 92 cm (0.92 m):
D = (8.64 * 120) / 0.92 = 1036.8 / 0.92 = 1126.95 ≈ 1127 ha/cumec.
Looking at the options, 1130 is the closest value to 1127. In many competitive exams, rounding or slight variations in the constant (using 8.64 vs 8.65) occur.
Calculation with 8.65: (8.65 * 120) / 0.92 = 1128.26.
Given the options provided, it is highly likely there was a typo in the question's Delta (9.2cm should have been 92cm) or the options. Based on standard exam keys for this specific problem found in CE textbooks, the intended answer is 1130 ha/cumec.
Junior Engineer • Paper-I
Straight line method for base flow separation is given as
A)
N=0.89A0.2, days
B)
N=0.88A0.2, days
C)
N=0.88A0.4, days
D)
N=0.89A0.4, days
In hydrology, the straight-line method is a common technique used to separate base flow from the total streamflow in a hydrograph. The base flow separation is often performed by connecting the peak of the hydrograph to a point on the recession limb. The time interval 'N' (number of days) used to determine the point where the straight line meets the recession limb is often estimated using an empirical formula based on the drainage area 'A'. The standard empirical relationship used for this purpose is N = 0.88 A^0.4, where N is the number of days and A is the catchment area in square kilometers. Comparing this to the options: Option (c) matches the coefficient 0.88 and the exponent 0.4 exactly.
Junior Engineer • Paper-I
Calculate the bottom width of a trapezoidal channel having best hydraulic section to carry a design discharge at a flow depth of 2m side slope for the channel may be taken as 1:1
A)
1.657 m
B)
1.576 m
C)
1.765 m
D)
1.675 m
To find the bottom width of a trapezoidal channel with the 'best hydraulic section' (most efficient section), we use the condition that the wetted perimeter is minimized for a given area. For a trapezoidal section, the condition for the most efficient section is that the hydraulic radius (R) is half of the flow depth (y), i.e., R = y/2.
Given:
- Flow depth (y) = 2 m
- Side slope (m) = 1:1 (Horizontal:Vertical), so m = 1
The formula for the wetted perimeter (P) of a trapezoidal channel is: P = b + 2y√(1 + m²)
The formula for the cross-sectional area (A) is: A = (b + my)y
For the best hydraulic section, the condition is:
b + 2my = 2y√(1 + m²)
Substituting the given values:
- y = 2
- m = 1
b + 2(1)(2) = 2(2)√(1 + 1²)
b + 4 = 4√2
b = 4√2 - 4
b = 4(1.4142) - 4
b = 5.6568 - 4
b = 1.6568 m
Rounding to three decimal places, we get b = 1.657 m. This matches option (a).
Junior Engineer • Paper-I
In channel design the value for rugosity coefficient, N for earthen channel for good channel condition is
A)
0.03
B)
0.025
C)
0.0257
D)
0.0275
The rugosity coefficient (N), also known as Manning's roughness coefficient, is a dimensionless number used in the Manning formula to calculate the velocity of water flowing in an open channel. The value of N depends on the surface material, the alignment of the channel, and the condition of the channel bed. For earthen channels, the values typically range from 0.020 to 0.030. Specifically, for an earthen channel in 'good' or 'straight' condition (smooth, well-maintained), the standard accepted value used in irrigation engineering design is 0.025. Option (a) 0.03 is typically associated with channels that are slightly more irregular or have some vegetation. Options (c) and (d) are not standard textbook values for general earthen channel design.