Define different types of earth mover, what is the best option for formation cutting machines nowadays and how and why ?
What is illumination ? How to calculate the level of illumination in a given room/ Buildings as Lux/ sqm?
Define Refrigeration Process in Modern Inverter frost free Refrigerator and advantages over Reciprocal compressor Refrigerator.
What is the most high precision measuring system? Mention its uses?
Purpose of backup protection is
A short circuit is identified by
Define Depreciation factor, and list out anything that effect the values of co-efficient of Utilization.
Load torques can be classified into how many types?
The minimum cover to the main bars in RCC beam should be
River Valley Projects having Hydro Electric Power Generation equal to or above 50 MW is categorize as-
Name any four laboratory test for cement.
Calculate the cost of earthwork for a forebay site. The Cross sectional area taken at an uniform interval of 10 m c/c. Area 1 - 28 sqm, Area 2 - 32 sqm, Area 3 - 18 sqm. Assume the rate of earthwork is Rs 100 per cum
The quorum of the meeting of Advisory Committee constituted under Forest (Conservation) Act, 2003. Shall be
Public hearing/Public Consultation for environmental clearance shall be conducted by-
It is the sanction of the detailed estimate, design calculations, quantities of works, rates and cost of the work by competent authority of the engineering department.
The portion of the slab constructed downward at the end of the heel slab to avolid sliding in retaining wall is called
For Structural member in concrete, the minimum grade of concrete should not be less than
In which Schedule of The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 is given fishing right to affected families in case of Irrigation or hydel projects
For obtaining Environmental clearance, Any Project activity specified in Category ‘B’ will be appraised at the Central level as Category ‘A’, if located in whole or in part within _______ from the boundary of (i) Protected area notified under Wild Life (Protection) act, 1972b (ii) Critically polluted areas as notified by the Central Pollution control Board under the water (Prevention and Control of Pollution) Act, 1974 from time to time (iii) Eco-sensitive areas as notified under sub-section (2) of section 3 of environment (Protection) Act, 1986 and (iv) Inter-State boundaries and International boundaries.
To ensure uniform pressure distribution, the thickness of foundation is kept
What are the four stages of process for obtaining environmental clearance for a new project ?
As per Land Acquisition, Rehabilitation and Resettlement Act, 2013 Rehabilitation and Resettlement Committee shall be constituted under the Chairmanship of the Collector if the land proposed to be acquired is equal to or more than
Public hearing for obtaining Environmental Clearance shall be completed within ____ from the date of receipt of request letter from the applicant
Indian Standard Code for Plain and reinforced Concrete:-
The property of soil by which water percolates through it is known as