The increase or decrease of the cost above the existing cost at the certain base year in schedule of rates.
The minimum cover to the main bars in RCC beam should be
As per Land Acquisition, Rehabilitation and Resettlement Act, 2013 Rehabilitation and Resettlement Committee shall be constituted under the Chairmanship of the Collector if the land proposed to be acquired is equal to or more than
In estimation, unit rate of painting item is measured in
The standard weight of 16mm dia MS bar is
For design of RCC retaining wall, the maximum factor of safety against overturning is
Darcy’s Law is applicable for only which type of flow?
To ensure uniform pressure distribution, the thickness of foundation is kept
M20 grade of Concrete means the 28 days characteristic compressive strength of concrete is
For Structural member in concrete, the minimum grade of concrete should not be less than
Analyse the rate for a Half Brick wall with cement mortar 1 : 3 in sqm. Requirement of Material for 100 sqm: (i) Brick First class 1000 Rs 20/No, (ii) Cement 20 bags Rs 600 per bag, (iii) Sand 2.50 cum Rs 3000 per cum, (iv) Mason 1.50 Mandays Rs 1000 per day, (v) Labour 3 Mandays Rs 600 per day, (vi) Water charge 1 %, (vii) CP & OH 10 %
Name the laboratory test used to find out the Maximum Dry Density?
Pycnometer is used to determine
In Estimate, It specifies or describe the nature and class of work, materials to be used in the work, workmanship etc
Preliminary Estimate of building is usually prepared using
The portion of the slab constructed downward at the end of the heel slab to avolid sliding in retaining wall is called
Proposal referred in sub-rule (2) in Forest (Conservation) Rules, 2003 involving Forest land more than _____ shall be sent by the State government to the Secretary to the Government of India, Ministry of Environment & Forest.
The minimum liquid capacity of septic tank as per IS 2470 (Part 1) -1985 is
Public hearing for obtaining Environmental Clearance shall be completed within ____ from the date of receipt of request letter from the applicant
For obtaining Environmental clearance, Any Project activity specified in Category ‘B’ will be appraised at the Central level as Category ‘A’, if located in whole or in part within _______ from the boundary of (i) Protected area notified under Wild Life (Protection) act, 1972b (ii) Critically polluted areas as notified by the Central Pollution control Board under the water (Prevention and Control of Pollution) Act, 1974 from time to time (iii) Eco-sensitive areas as notified under sub-section (2) of section 3 of environment (Protection) Act, 1986 and (iv) Inter-State boundaries and International boundaries.
What are the four stages of process for obtaining environmental clearance for a new project ?
Expert Appraisal Committee (EAC) constituted by the Central Government for category A project shall not exceed _____ regular members.
The property of soil by which water percolates through it is known as
Darcy’s Law is applicable for only which type of flow.
Draw a neat sketch showing the active and Passive state of Plastic equilibrium behind a Retaining wall.