Past Questions
In which Schedule of The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 is given fishing right to affected families in case of Irrigation or hydel projects
In Estimate, It specifies or describe the nature and class of work, materials to be used in the work, workmanship etc
Preliminary Estimate of building is usually prepared using
The portion of the slab constructed downward at the end of the heel slab to avolid sliding in retaining wall is called
Sand with a uniformly coefficient value more than 6 can be treated as
Proposal referred in sub-rule (2) in Forest (Conservation) Rules, 2003 involving Forest land more than _____ shall be sent by the State government to the Secretary to the Government of India, Ministry of Environment & Forest.
Public hearing for obtaining Environmental Clearance shall be completed within ____ from the date of receipt of request letter from the applicant
For obtaining Environmental clearance, Any Project activity specified in Category ‘B’ will be appraised at the Central level as Category ‘A’, if located in whole or in part within _______ from the boundary of (i) Protected area notified under Wild Life (Protection) act, 1972b (ii) Critically polluted areas as notified by the Central Pollution control Board under the water (Prevention and Control of Pollution) Act, 1974 from time to time (iii) Eco-sensitive areas as notified under sub-section (2) of section 3 of environment (Protection) Act, 1986 and (iv) Inter-State boundaries and International boundaries.
In the first schedule of Land Acquisition, Rehabilitation and Resettlement Act, 2013, the factor by which the market value is to be multiplied in case of Urban areas
What are the four stages of process for obtaining environmental clearance for a new project ?
Expert Appraisal Committee (EAC) constituted by the Central Government for category A project shall not exceed _____ regular members.
The property of soil by which water percolates through it is known as
Draw a neat sketch showing the active and Passive state of Plastic equilibrium behind a Retaining wall.
According to Indian standards the specific gravity of soil is the ratio of the unit weight of the soil solids to that of water at a temperature of
Calculate the Maximum Bending Moment in a simply supported beam having a live load of 15 kN/m and a dead load of 5 kN/m. The effective span of the beam is 5.50m.
The standard cube size for testing the compressive strength of concrete is-
Calculate the cost of earthwork for a forebay site. The Cross sectional area taken at an uniform interval of 10 m c/c. Area 1 - 28 sqm, Area 2 - 32 sqm, Area 3 - 18 sqm. Assume the rate of earthwork is Rs 100 per cum
Soil which contains finest grain particles is
What do you mean by workability of concrete? What affects workability?
As per IS- 456:2000, expansion joints in structures are provided in structure lengths greater than
A septic tank is a water tight tank where the following operations take place:
What is the full form of HDF Board? How does it differ from MDF board in its application?
The phenomenon of heat build up in cities leads to the formation of:
A covering of concrete placed on the exposed top of an external wall, is known as
Pointing is a construction technique used in